REFURBISHMENT OF A FARM COTTAGE

This was a complete refurbishment of a two bedroom cottage. The project took three months and was in two phases.

 

Phase One - External Work's
This included demolition of unsafe buildings & barns, removal of an asbestos roof replacing it with a new slate tiled roof. Installing 150 metres of tanalised close board fencing, major drainage works including a brand new soak away. 

Phase Two - Internal Works
The interior of the cottage needed full refurbishment which included some structural work. A new dorma window was fitted to create a bathroom on the first floor. Additional structural support was added to create an open plan ground floor.
All new plumbing and heating system was installed and a full electrics rewire including data points and smart sockets to be compliant with the relevant clauses of BS7671:2008. A full redecoration was needed on the interior and exterior.